Operational Programme on Transport and Transport Infrastructure 2014-2020

Sofia Metro Extension Project, Stage III, Lot 1 “Tsarigradsko Shose — Druzhba RD — Sofia Airport” and Lot 2 “Mladost 1 RD — Business Park in Mladost 4”

9 October 2015

Total value of the project:  406,553,284 BGN

Grant awarded under OP Transport:  215,141,300 BGN

Sources of funding:

- European Regional Development Fund: 182,870,105 BGN

- National co-funding:  32,271,195 BGN

Beneficiary: Metropoliten JSC

The project is funded under Priority Axis 3 “Improving the intermodality of passenger and freight transportation” and Operational Programme Transport 2007-2013.

Stage III was approved by the European Commission in December 2012 and was launched in the first half of 2013. Deadline for implementation: April 2015.

Aim of the project

Extending the line from Tsarigradsko Shose Blvd. to Sofia Airport in the north-east and from Mladost 1 do Mladost 4 in the south-east will facilitate the transportation of large passenger flows from the eastern parts of the city. Direct connections between Sofia Airport and the national railway network, major roads and bus stations in the city of Sofia will also be implemented in the near future, creating a fast intermodal connection between the main modes of transport.

The main users of the project will be the additional 190,000 citizens of Sofia who will be served by the extended metro diameter, the employees who will be hired for the 251 new jobs to be created by Metropoliten JSC, citizens and guests in Sofia.

Technical parameters of project

Lot 1 — “Tsarigradsko Shose Blvd. — Druzhba RD — Sofia Airport” — This is an extension of the first metro diameter from Tsarigradsko Shose Blvd. through Druzhba RD to Sofia Airport. The section is 5 km long and has 4 metro stations, 2 of which are underground and 2 are elevated — on the ramp and at the ground level.

The following activities are included:

In addition to the above-mentioned construction works Lot 1 includes:

Lot 2 — “Mladost 1 RD — Business Park in Mladost 4” — This is a branch of the first metro diameter from Mladost 1 RD to the Business Park in Mladost 4. The section is entirely underground, with a length of 2 620 m and 3 metro stations.

The following activities are included:

In addition to the above-mentioned construction works the section includes:

The construction of the sections also includes the following activities: working design, reconstruction of affected engineering networks, supervision and expropriation of terrains.

Sofia Metro Extension Project, Stage III, Lot 1 “Tsarigradsko Shose — Sofia Airport”

Value of the construction contract: BGN 12,664,769 (excluding VAT)

Contractor: Stanilov – Metroprojekt Holding

Value of the construction contract: BGN 48,509,256 (excluding VAT)

Contractor: Metro Druzhba DZZD Holding (DZZD: company under the Law on Obligations and Contracts)

Value of the construction contract: BGN 24,887,238 (excluding VAT)

Contractor: Metro Sifer Holding

Sofia Metro Extension Project, Stage III, Lot 2, section from MS 13 (Mladost 1, km 15+450) to MS 16 (Business Park in Mladost 4, km 18+070) — with 2 metro stations

Value of the construction contract for Autonomous position No. 1: BGN 33,583,761 (excluding VAT)

Contractor: Metro Build Mladost Holding

Value of the construction contract for Autonomous position No. 2: BGN 19,790,438 (excluding VAT);

Contractor: Geometro B. P. Holding

Expected results if the project is successfully implemented