Operational Programme on Transport and Transport Infrastructure 2014-2020

Project Highway "Kalotina-Sofia" – LOT 1, West arc of SRR, section 1 – Road II-18 SRR in the section from km 59+400 to km 61+629 and from km 0+000 to km 0+780"

Deadline: The project is planned to be accomplished on 31.10.2014

Beneficiary: Agency "Road Infrastructure"

Budget:

Total cost of the project:   250 656 833.04 BGN

Awarded grant under OP "Transport":   44 803 075.94 BGN with VAT on the base of Ministerial Counsel Act (MCA) 676/21.08.2012

Sources of grant funding:

Cohesion Fund of EU: 35 842 460.75 BGN

National co-financing: 8 960 615.19 BGN

The project is funded under Priority Axis 2 "Development of road infrastructure along the Trans-European and major national transport axes" of the Operational Programme "Transport" 2007-2013

 

Aim of the project

The western arc of SRR is a natural extension of Highway "Lyulin". When constructed, the object will provide for the connection to and from Republic of Serbia with the main highway ring under construction in Republic of Bulgaria and it will ensures smooth distribution of local and transit traffic.

Location

Technical parameters of the project

Overall length: 3.009 km;

Direct trace with three lanes in a direction, and two conductive roads for access with overall gauge clearance 46.0m;

Design speed: 100 km/h;

Road junction “Queen Joanna” with overpass over “Queen Joanna” Boulevard;

Road junction at “Slivnitsa” Boulevard;

Bridge over the river Kakach in the direction Kalotina;

Bridge over the river Kakach at km 0+745;

Project executors

Executor: CLEA "TRACE SRR"

Participants:

1. "Trace Group Hold” JSC

2. "PSI" JSC

3. "Road Construction" JSC

4. "Stanilov" LLC

The value of the contract: 47 820 000.00 BGN with VAT

Executor: CLEA "ROADCONSULT 2000-THREE S"

Participants:

1. "Roadconsult 2000" LLC

2. "Three S" LLC

Value of the contract: 1 171 800.00 BGN with VAT